Ensurepass

QUESTION 11

A technician is upgrading the memory in a server. The server requires DDR3 Registered DIMMs. The server hasfourbanks ofthreeslots for memory and currently there is one 2GBmodule in each bank. When the technician attempts to add eight more 4GB modules of DDR3unbuffered ECC memory,the memory does notfit in the slots. Which of the following is thecause ofthis issue?

 

A.

In a bank, 2GB and 4GB memory cannot be mixed.

B.

The server cannot use ECC memory.

C.

The server requires fully buffered memory.

D.

The total memory on the server cannot exceed 24GB of RAM.

 

Correct Answer: C

 

 

QUESTION 12

A server technician is performing a server installation. This server must be able to resolve host names for users running a variety of client operating systems. At a minimum, which of the following services should be enabled on the new server? (Select TWO).

 

A.

NAT

B.

DNS

C.

LDAP

D.

WINS

E.

SNMP

F.

DHCP

 

Correct Answer: BD

 

 

QUESTION 13

A technician has traveled toacompany’s alternate site to assess current operations of the network infrastructure. Following the assessment, the technician has informed management that everything is operational, with all applications and data mirrored. Which of the following types of site does the company have?

 

A.

Warm site

B.

Cold site

C.

Hot site

D.

Standby site

 

Correct Answer: C

 

 

QUESTION 14

A system administrator needs to directly control a server that has no network connectivity. Which of the following should be used to accomplish this?

 

A.

SSH

B.

KVM

C.

RDP

D.

iLO/iDRAC

 

Correct Answer: B

 

 

QUESTION 15

A system administrator is given a server with an existing OS installed and four empty SAS bays. The system administrator is asked to set up a new data drive for testing with 100GB of data. For the best possible performance, which of the following should the system administrator select for the data storage?

 

A.

SCSI

B.

SATA

C.

Solid state drive

D.

Flash drive

 

Correct Answer: C

 

 

QUESTION 16

Two new applications have been added to a working s
erver. The server response is now very slow. An appropriate plan of action is to:

 

A.

uninstall each server application and reinstall the two new applications.

B.

install another application to see if this improves the server response time.

C.

install antivirus and malware software.

D.

uninstall the newly installed applications one at a time.

 

Correct Answer: D

 

 

 

 

QUESTION 17

A server technician is connecting a server to a switch in the server room. Both the server and the switch are equipped with 10 Gigabit Ethernet adapters. Which of the following cable choices would produce the BEST throughput?

 

A.

CAT6 rollover cable

B.

CAT5e straight-through cable

C.

CAT6 straight-through cable

D.

CAT5e crossover cable

 

Correct Answer: C

 

 

QUESTION 18

A technician needs to add a processor to a server. Which of the following specifications should the technician examine? (Select THREE).

 

A.

Bus multiplier

B.

Processor speed

C.

Socket type

D.

Processor stepping

E.

L3 cache size

F.

Thermal specifications

 

Correct Answer: BCD

 

 

QUESTION 19

A server with a number of graphics cards installed was recently upgraded with additional graphics cards. Once the server is started, the system powers off unexpectedly. Prior to the upgrade, the server was stable and exhibited no odd behavior. Which of the following is the MOST likely cause of the problem?

 

A.

The card device drivers are out of date and need to be updated.

B.

The power supply cannot handle the additional power for the new cards.

C.

The operating system does not recognize the new cards.

D.

The cards are not compatible with the other server hardware.

 

Correct Answer: B

 

 

QUESTION 20

A network administrator installs a new web server and notices that the server was configured with one quad-port NIC. In order to properly provision the hardware resources, how should the NIC be configured?

 

A.

Assign at least one IP address to each port

B.

Assign multiple IP addresses to one port

C.

Assign one IP address to the quad-port NIC

D.

Assign a single IP address to all four ports

 

Correct Answer: A

 

Free VCE & PDF File for CompTIA SK0-004 Real Exam

Instant Access to Free VCE Files: CompTIA | VMware | SAP …
Instant Access to Free PDF Files: CompTIA | VMware | SAP …

 

Comments are closed.